Machine Pad Foundations
Commercial machine pad foundations in Allen, TX
As a general contractor working directly with developers and property owners, we deliver machine pad foundations services for commercial and industrial properties throughout Allen, TX and the DFW metroplex. No subcontracting, just our experienced crews, your project, and clear accountability.
Service Overview
Machine foundations support the precision equipment that manufacturing and industrial facilities depend on. Unlike general building foundations, machine pads must address vibration isolation, anchor bolt precision, and the specific load requirements of each piece of equipment. Generic concrete work does not meet these demands.
Our machine foundation process begins with equipment specifications. We review manufacturer requirements for mass, isolation, anchor patterns, and any special provisions like oil collection or coolant trenches. This information drives foundation design in coordination with structural engineers when required.
Vibration isolation is critical for precision equipment. CNC machines, coordinate measuring equipment, printing presses, and production machinery each have specific isolation requirements. We install appropriate isolation systems and verify that foundations meet equipment manufacturer specifications before turnover.
Anchor bolt installation requires precision that standard construction practices do not achieve. We use templates, survey control, and verification procedures to place anchors within manufacturer tolerances. This attention to detail prevents the costly rework and equipment problems that result from imprecise anchor installation.
What's Included
Scope inclusions for commercial machine pad foundations
- Equipment specification review
- Foundation design coordination with structural engineer
- Excavation and subgrade preparation
- Isolation system installation
- Reinforcement and embedded item placement
- Precision anchor bolt installation
- Concrete placement and finishing
- Anchor survey and documentation
- Coordination with equipment installer
Common Project Situations
Frequently Asked Questions
Common questions about machine pad foundations
How do you determine the right foundation size for industrial equipment?
Foundation sizing depends on equipment weight, dynamic loads, vibration characteristics, and manufacturer requirements. We review equipment specifications and coordinate with structural engineers to design foundations that meet all performance requirements.
What vibration isolation systems do you install?
We install various isolation systems depending on equipment requirements: isolation pads, spring mounts, inertia blocks, and air-spring systems. The appropriate system depends on vibration frequency, amplitude, and isolation requirements specified by the equipment manufacturer.
How precise can you install anchor bolts?
We routinely achieve 1/16 inch or better anchor placement accuracy using templates and survey control. For equipment requiring tighter tolerances, we use adjustable anchor systems that allow final positioning during equipment installation.
Can you install machine foundations in operating facilities?
Yes. We regularly install machine foundations in operating manufacturing and production facilities. This requires coordination with plant operations, dust and vibration control, and scheduling work to minimize production impact.
What documentation do you provide for machine foundation work?
We provide anchor location surveys, concrete test results, and as-built drawings showing foundation dimensions and reinforcement. This documentation supports equipment installation and becomes part of the facility's permanent records.
Example Project Capability
Representative project scope
Situation
Aerospace manufacturer expanding machining capacity needed foundations meeting strict vibration isolation and anchor tolerance requirements
Scope
Isolated foundations for (4) CNC machining centers with precision anchor placement
Our Approach
Coordinated with equipment vendor on specifications, installed spring isolation systems, achieved anchor placement within 1/32 inch tolerance
Expected Outcome
Equipment installed and calibrated successfully, vibration measurements within manufacturer specifications, production began on schedule
Contact us to discuss your machine foundation project in North Texas.
Discuss Your ProjectReady to discuss your project?
Let's engineer the machine pad foundations scope for your property
Share your drawings and requirements. We will deliver a detailed budget, schedule, and sequencing plan directly to you as the property owner or developer.