Concrete Contractors of Allen
Parking Lot Striping and Pavement Markings
Commercial Service

Parking Lot Striping and Pavement Markings

Full-service turnkey concrete delivery for property owners, developers, and facility teams across Allen and North Texas—one accountable team from bid through closeout.

About Parking Lot Striping and Pavement Markings

A freshly poured parking lot in Allen still needs a second layer of work before it functions: striping, ADA markings, fire lane lettering, directional arrows, and wheel stops. We handle that layer ourselves rather than handing it off to a separate vendor once the concrete cures. Because our crews already know the joint layout, drainage grades, and curb geometry from the pour, the striping plan lines up with the physical concrete instead of getting redrawn from a generic template.

Most of our striping work in Collin County happens two ways: as the final step on a new parking lot or expansion we just built, and as a standalone repaint on an existing property where lines have faded under North Texas sun and traffic. Retail centers along Stacy Road and Bethany Drive, medical office parks near the Allen hospital corridor, and industrial lots off Watters Branch Road all deal with the same problem — six to eighteen months of UV exposure and heavy tire wear will fade standard traffic paint to the point where ADA compliance and fire marshal inspections become a liability.

We use waterborne and fast-cure epoxy paint systems depending on turnaround needs and traffic volume, and we lay out ADA stalls, access aisles, and van-accessible spaces to current slope and dimension requirements rather than just repainting over the old lines in the old spots. Fire lane striping and curb painting follow the requirements set by Allen Fire Department and Collin County ESD standards, including red curb paint and required lettering spacing. For properties with heavy delivery traffic, we also stripe directional arrows, stop bars, and speed bumps to keep vehicle flow predictable.

Scheduling is structured to minimize downtime for occupied properties. Most restriping jobs on active retail or office lots are completed overnight or across a weekend, with paint cure times factored into the reopening schedule so tenants and customers are not walking or driving across wet lines. For general contractors managing a new-build handoff, we coordinate striping as the last item before certificate of occupancy walk-throughs, so the lot is inspection-ready on the date the project needs it.

What’s Included

  • New striping layout and paint for freshly poured lots
  • Full restripe of faded or worn existing lots
  • ADA-compliant stall, access aisle, and van-accessible layout
  • Fire lane painting and lettering to Allen Fire Department standards
  • Directional arrows, stop bars, and speed bump striping
  • Curb painting for fire lanes, no-parking zones, and loading areas
  • Wheel stop and bollard installation
  • Overnight and weekend scheduling for occupied properties

Frequently Asked Questions

How often does a commercial parking lot in Allen need to be restriped?

Most asphalt and concrete lots in North Texas need restriping every 12-24 months depending on traffic volume and sun exposure. High-turnover retail lots and drive-thru lanes often need touch-ups annually, while lower-traffic office and industrial lots can go two to three years between full restripes.

Do you handle ADA-compliant striping and signage?

Yes. We lay out accessible parking stalls, access aisles, and van-accessible spaces to current ADA slope and dimension standards, and we can coordinate accessible signage installation as part of the same scope so the lot passes inspection the first time.

Can striping be done without closing the parking lot?

In most cases yes. We phase striping across sections of the lot, work overnight or over a weekend, and use barricades and cones to keep areas closed only while paint cures. Full lot closures are usually limited to smaller properties or complete relayouts.

What is the difference between waterborne and epoxy striping paint?

Waterborne paint is faster and more economical for standard restripes and dries enough for light traffic within a few hours. Epoxy is more durable and holds color longer under heavy traffic and UV exposure, which we typically recommend for fire lanes, high-traffic drive aisles, and properties on a longer restriping cycle.

Do you stripe new parking lots you did not pour yourself?

Yes, though we prioritize doing the layout ourselves whenever possible so the striping plan matches the actual joint pattern and drainage grade rather than a plan drawn against an as-built survey. On lots we did not pour, we field-verify the layout before painting to catch any conflicts.

Call NowParking Lot Striping and Pavement Markings | Commercial Concrete | Allen, TX | Concrete Contractors of Allen